Skip to content
Service

Building and cadastral filings (pratiche edilizie e catastali)

CILA, SCIA, Permesso di costruire, sanatorie, landscape permits, cadastre

What it is

When you carry out works, or when the state of the property does not match its documents, you need the right filing with the Comune or the Catasto (land registry). These are the most common ones.

When you need it

When you carry out works, or when the actual state of the property does not match the documents filed with the Comune or the Catasto, including to regularise works already done without a permit.

What it includes

  • Site visit and survey of the premises
  • Preliminary check of feasibility and of planning compliance
  • Drawings and technical report
  • Completion and online submission of the filing to the Comune
  • Sworn statement by the technician (asseverazione) and handling of any requests for additional information

The most common filings

To carry out works

C.I.L.A. (simple works)

Light internal works

Painting, floors, renovating a bathroom or kitchen, systems, moving a partition wall. CILA: notice of works signed by a technician.

C.I.L.A. (complex works)

Major internal works

Several partition walls, completely new systems, new room layout: even a full internal renovation, as long as the structure is not touched

S.C.I.A. (external, non-structural works)

External works, without touching the structure

Changes to façades, elevations or external finishes that do not involve load-bearing walls, floors or beams. SCIA: certified notice of start of works.

S.C.I.A. (structural works)

The structure is affected, inside or outside

Load-bearing walls, floors, beams, stairs, new openings in load-bearing walls

Permesso di Costruire (extension)

Enlarging the property

Veranda, extra storey, extension: volume or floor area increases. Permesso di costruire: building permit.

Permesso di Costruire (new building)

Building from scratch

New building on buildable land, or demolition and reconstruction

Complex building filing

None of the cases above

Special situation: several permits together, atypical property, multiple constraints

To regularise works already done

C.I.L.A. tardiva (late CILA)

Light works already carried out

Works that only needed a notice to the Comune, but the notice was never filed

S.C.I.A. in sanatoria (retrospective SCIA)

Substantial internal works already carried out

Partition walls moved, rooms changed in use, actual state different from the filed floor plan

Permesso di Costruire in sanatoria (retrospective permit)

Extra volume or floor area already built

Enclosed verandas, mezzanines, canopies, extensions never authorised

Properties in protected areas

Compatibilità paesaggistica (simplified procedure)

Minor discrepancies in a protected area

Minor works already done on a property under landscape protection (vincolo paesaggistico)

Compatibilità paesaggistica (ordinary procedure)

Significant works in a protected area

Larger works in a protected area: a longer procedure that goes through the Soprintendenza (heritage authority)

Cadastre and documents

Cadastral update (DOCFA), simple

The cadastral floor plan needs updating

The actual state does not match the filed drawing: simple internal changes

Cadastral update (DOCFA), complex

Units need merging, splitting or a new category

Merging or splitting of units, change of use, cadastral income (rendita) to be recalculated

Records access and document retrieval

You need the documents from the Comune

Retrieval of the building permit, the filed floor plan, the historical file

The technician confirms the correct filing after seeing the property.

Timing and cost

Quote on request, within 48 hours. Once you accept the quote and pay the advance, the technician contacts you within 72 hours.

The cost depends on the size of the property, the documents available, the complexity of the case and the distance.

Frequently asked questions

CILA, SCIA or Permesso di costruire: which one do I need?

It depends on the works. For internal works that do not touch the structure a CILA is normally enough; for external works or works on structural parts you need a SCIA; to increase volume or floor area, or to build from scratch, you need a Permesso di costruire (building permit). The technician confirms the correct filing after seeing the property.

Some works were done without permits: can this be fixed?

Often yes, with a retrospective filing (sanatoria): CILA tardiva, SCIA in sanatoria or Permesso di costruire in sanatoria, depending on the works. Whether and how to regularise is assessed by the technician case by case. Any penalties are paid by the owner and are listed separately in the quote.

What is records access (accesso agli atti) and when do I need it?

It is the request to the Comune for the property's documents: the building permit, the filed floor plan, the historical file. You need it when you do not have these documents and must find out what was authorised, almost always before a retrospective filing (sanatoria) or a compliance check.

Quote request

Request a quote for this service

Describe the property and what you need. We reply within 48 hours with a quote or with the questions we need answered.

Describe the property and what you need: type of property, situation, timing.

Prefer email? Write to project@valenteit.com.